Your data doesn't train Genie's AI
You keep IP ownership聽of your docs
1. Executive Summary: Brief overview of key findings, risk levels, and main recommendations
2. Introduction: Purpose of assessment, scope of work, and site identification details
3. Site Information: Detailed description of premises, building age, construction type, and areas assessed
4. Assessment Methodology: Description of inspection methods, sampling protocols, and laboratory testing procedures used
5. Regulatory Framework: Overview of relevant Hong Kong regulations and standards applied in the assessment
6. Findings and Results: Detailed results of the assessment, including location and condition of asbestos-containing materials
7. Risk Assessment: Evaluation of risks based on condition, location, and potential for disturbance of asbestos materials
8. Conclusions: Summary of key findings and overall assessment of asbestos risks
9. Recommendations: Specific actions required for asbestos management, removal, or monitoring
1. Historical Review: Analysis of building history and previous asbestos assessments, included when historical data is available
2. Air Monitoring Results: Results of air quality testing, included when air sampling was conducted
3. Occupant Exposure Assessment: Evaluation of potential exposure risks to building occupants, included for occupied buildings
4. Cost Estimates: Estimated costs for recommended remediation work, included when requested by client
5. Management Plan: Detailed asbestos management procedures, included for buildings requiring ongoing management
1. Appendix A - Site Plans and Drawings: Marked-up floor plans showing sampling locations and asbestos-containing materials
2. Appendix B - Photograph Log: Photographic documentation of sampling locations and identified asbestos materials
3. Appendix C - Laboratory Results: Detailed laboratory analysis reports for all samples collected
4. Appendix D - Sample Register: Complete register of all samples taken, including location, type, and results
5. Appendix E - Surveyor Qualifications: Copies of relevant qualifications and licenses of assessment team
6. Appendix F - Risk Assessment Matrix: Detailed risk assessment criteria and evaluation matrices used
7. Appendix G - Regulatory References: Copies of relevant regulations and guidelines referenced in the assessment
Find the exact document you need
Property Complaint Letter
A formal letter used in Hong Kong to document and communicate property-related complaints, issues, or concerns in accordance with local property laws.
Straight Letter Of Credit
A Hong Kong law-governed banking instrument that provides an irrevocable payment undertaking from a bank to a beneficiary upon presentation of compliant documents.
Inland Letter Of Credit
A bank-issued payment guarantee document for domestic trade transactions in Hong Kong, governed by local banking laws and regulations.
Commercial Commission Contract
A Hong Kong law-governed contract establishing terms and conditions for commission-based business relationships, including commission structures, obligations, and performance standards.
Asbestos Assessment Report
A technical report assessing asbestos presence and risks in Hong Kong properties, prepared under Cap. 311 requirements by licensed consultants.
Owner Builder Agreement
A Hong Kong-compliant agreement establishing terms and conditions between an owner-builder and construction stakeholders for building projects.
骋别苍颈别鈥檚 Security Promise
Genie is the safest place to draft. Here鈥檚 how we prioritise your privacy and security.
Your documents are private:
We do not train on your data; 骋别苍颈别鈥檚 AI improves independently
All data stored on Genie is private to your organisation
Your documents are protected:
Your documents are protected by ultra-secure 256-bit encryption
We are ISO27001 certified, so your data is secure
Organizational security:
You retain IP ownership of your documents and their information
You have full control over your data and who gets to see it

.png)