Your data doesn't train Genie's AI
You keep IP ownership聽of your docs
1. 1. Project Information: Details of the project, location, and parties involved including main contractor and subcontractors
2. 2. Scope of Works: Detailed description of the column formwork activities to be undertaken
3. 3. References: List of relevant codes, standards, and specifications applicable to the work
4. 4. Definitions: Key terms and abbreviations used in the method statement
5. 5. Responsibilities: Roles and responsibilities of all parties involved in the formwork operations
6. 6. Materials and Equipment: Specifications of formwork materials, tools, and equipment to be used
7. 7. Pre-construction Requirements: Preparatory works, site conditions, and checks required before commencing work
8. 8. Installation Procedure: Step-by-step procedure for formwork installation including setting out, assembly, and bracing
9. 9. Quality Control Measures: Inspection and testing requirements during installation and before concrete pour
10. 10. Safety Requirements: Safety measures, PPE requirements, and risk control procedures
11. 11. Environmental Controls: Measures to minimize environmental impact and manage waste
12. 12. Emergency Procedures: Response procedures for potential emergency situations
1. Special Installation Requirements: For use when non-standard or complex formwork systems are being employed
2. Interface Management: Required when work interfaces with other trades or existing structures
3. Temporary Works Design: Include when special temporary support systems are required
4. Winter Working Measures: Required for projects continuing through cold weather periods
5. Specialized Equipment Operations: Include when using specialized forming systems or equipment
6. Concrete Placement Coordination: Required when complex concrete pour sequences are involved
1. Appendix A: Risk Assessment: Detailed risk assessment for all formwork operations
2. Appendix B: Inspection Checklists: Pre-pour and general inspection checklists
3. Appendix C: Equipment Specifications: Technical specifications for formwork systems and components
4. Appendix D: Drawing References: List of relevant drawings and sketches
5. Appendix E: Qualification Requirements: Required certifications and qualifications for workers
6. Appendix F: Emergency Contact List: List of emergency contacts and response team members
7. Appendix G: Toolbox Talk Topics: Safety briefing subjects specific to formwork operations
8. Appendix H: Quality Control Forms: Forms for recording inspections and quality checks
Find the exact document you need
Breaking Lease Letter
A formal notice under Hong Kong law for early lease termination, documenting a tenant's intention to end a lease agreement before its scheduled completion date.
Water Supply Complaint Letter
A formal complaint letter template for addressing water supply issues with Hong Kong's Water Supplies Department, following local regulatory requirements.
Site Access Agreement
A Hong Kong law-governed agreement establishing terms and conditions for authorized access to premises or facilities, including safety, security, and liability provisions.
Road Agreement
A Hong Kong law-governed agreement for road construction, maintenance, or improvement works, detailing technical specifications and regulatory requirements.
Water Leakage Complaint Letter To Society
A formal complaint letter to property management societies regarding water leakage issues in Hong Kong properties, aligned with local building management regulations.
Method Statement For Column Formwork
A technical document detailing procedures and safety requirements for column formwork operations under Hong Kong construction regulations.
Method Statement For Demolition Of Concrete Slab
A technical document outlining methodology and safety procedures for concrete slab demolition in Hong Kong, complying with local building regulations and safety standards.
Timesheet Invoice
A Hong Kong-compliant billing document that combines detailed time tracking with standard invoice elements for charging based on time spent on projects or services.
Painting Invoice
A Hong Kong-compliant invoice template for painting services, including detailed service breakdowns and payment terms.
Landscaping Invoice
A Hong Kong-compliant invoice document for landscaping services, including service details, costs, and payment terms.
Tooling Agreement
A Hong Kong law-governed agreement setting out terms for industrial tooling supply, ownership, and usage rights.
Aluminium Formwork Method Statement
A technical document outlining procedures and safety requirements for aluminum formwork operations in Hong Kong construction projects, compliant with local building and safety regulations.
Survivorship Deed
A Hong Kong legal document that transfers property ownership to surviving joint tenant(s) following the death of a co-owner.
Method Statement And Risk Assessment For Excavation
A technical document outlining excavation methodology and safety procedures under Hong Kong construction regulations, detailing risk assessment and control measures for safe excavation works.
Conciliation Settlement Agreement
A legally binding agreement under Hong Kong law that documents the terms of settlement reached through conciliation, including resolution terms and mutual obligations of the parties.
Savings Account Agreement
A Hong Kong law-governed agreement establishing terms and conditions for savings account services between a bank and its customers.
Group Release Form
A Hong Kong law-governed form obtaining collective consent and liability waivers from multiple participants for organizational activities and events.
Rollover Loan Agreement
A Hong Kong law-governed agreement establishing a rollover loan facility with provisions for successive loan period extensions and associated terms.
Middleman Commission Agreement
A Hong Kong law-governed agreement establishing terms and commission structure between a principal and middleman for business facilitation services.
骋别苍颈别鈥檚 Security Promise
Genie is the safest place to draft. Here鈥檚 how we prioritise your privacy and security.
Your documents are private:
We do not train on your data; 骋别苍颈别鈥檚 AI improves independently
All data stored on Genie is private to your organisation
Your documents are protected:
Your documents are protected by ultra-secure 256-bit encryption
We are ISO27001 certified, so your data is secure
Organizational security:
You retain IP ownership of your documents and their information
You have full control over your data and who gets to see it

.png)