tiktok³ÉÈ˰æ

Aluminium Formwork Method Statement Template for Malaysia

Create a bespoke document in minutes,  or upload and review your own.

4.6 / 5
4.8 / 5

Let's create your Aluminium Formwork Method Statement

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

Get your first 2 documents free

Your data doesn't train Genie's AI

You keep IP ownership of your information

Key Requirements PROMPT example:

Aluminium Formwork Method Statement

"I need an Aluminium Formwork Method Statement for a 30-story residential development project in Kuala Lumpur, with specific focus on high-rise safety protocols and accelerated construction timeline for project completion by March 2025."

Document background
The Aluminium Formwork Method Statement is a crucial document required for construction projects in Malaysia that utilize aluminum formwork systems. This document ensures compliance with Malaysian construction regulations, including CIDB requirements, OSHA 1994, and relevant Malaysian Standards. It is typically required before commencing any construction work involving aluminum formwork systems and must be submitted to relevant authorities for approval. The method statement includes comprehensive details about installation procedures, safety measures, quality control requirements, and technical specifications. It serves as a primary reference document for construction teams and regulatory inspectors, ensuring consistent application of safe and efficient aluminum formwork practices across Malaysian construction projects.
Suggested Sections

1. 1. Introduction: Project overview, scope of works, and document purpose

2. 2. Reference Documents: List of applicable standards, codes, and regulations

3. 3. Material Specifications: Detailed specifications of aluminum formwork components and accessories

4. 4. Equipment and Tools: List and specifications of required equipment and tools

5. 5. Safety Requirements: Mandatory safety measures, PPE requirements, and risk assessments

6. 6. Pre-Installation Requirements: Site preparation, storage, and handling procedures

7. 7. Installation Procedure: Step-by-step installation methodology

8. 8. Quality Control Measures: Inspection points, tolerances, and quality checks

9. 9. Stripping Procedure: Safe removal and dismantling procedures

10. 10. Cleaning and Maintenance: Procedures for cleaning, storing, and maintaining formwork

Optional Sections

1. Special Weather Considerations: Additional procedures for extreme weather conditions, used in projects in areas with severe weather

2. High-Rise Implementation: Special procedures for high-rise buildings, included when project involves tall structures

3. Specialized Architectural Features: Additional procedures for complex architectural elements, used when project includes non-standard features

4. Emergency Response Plan: Specific emergency procedures, included for high-risk or remote locations

5. Environmental Management: Additional environmental protection measures, used in environmentally sensitive areas

Suggested Schedules

1. Appendix A: Technical Drawings: Detailed drawings of formwork components and assembly details

2. Appendix B: Inspection Checklists: Quality control and safety inspection forms

3. Appendix C: Risk Assessment: Detailed risk assessment and control measures

4. Appendix D: Equipment Specifications: Detailed specifications of major equipment

5. Appendix E: Material Testing Requirements: Testing procedures and acceptance criteria

6. Appendix F: Safety Data Sheets: SDS for any chemicals or hazardous materials used

Authors

Alex Denne

Head of Growth (Open Source Law) @ tiktok³ÉÈ˰æ | 3 x UCL-Certified in Contract Law & Drafting | 4+ Years Managing 1M+ Legal Documents | Serial Founder & Legal AI Author

Relevant legal definitions






























Clauses




















Relevant Industries

Commercial Construction

Residential Development

Industrial Construction

Infrastructure Development

High-rise Construction

Public Housing

Mixed-use Development

Educational Facilities

Healthcare Facilities

Relevant Teams

Project Management

Construction Operations

Health and Safety

Quality Control

Technical Services

Risk Management

Site Operations

Engineering

Compliance

Construction Planning

Relevant Roles

Project Manager

Site Engineer

Construction Manager

Safety Manager

Quality Control Manager

Formwork Supervisor

Construction Superintendent

Technical Director

Risk Assessment Officer

Method Statement Engineer

Construction Safety Officer

Quality Assurance Engineer

Industries








Teams

Employer, Employee, Start Date, Job Title, Department, Location, Probationary Period, Notice Period, Salary, Overtime, Vacation Pay, Statutory Holidays, Benefits, Bonus, Expenses, Working Hours, Rest Breaks,  Leaves of Absence, Confidentiality, Intellectual Property, Non-Solicitation, Non-Competition, Code of Conduct, Termination,  Severance Pay, Governing Law, Entire Agreemen

Find the exact document you need

Method Statement For Cutting Concrete Slab

A technical document outlining methodology and safety procedures for concrete slab cutting operations in compliance with Malaysian construction and safety regulations.

find out more

Cofferdam Construction Method Statement

A Malaysian-compliant technical document outlining the methodology and safety procedures for cofferdam construction, following DOSH and CIDB requirements.

find out more

Method Statement For Column Formwork

A technical document outlining procedures and requirements for column formwork installation in Malaysian construction projects, complying with local regulations and standards.

find out more

Method Statement For Demolition Of Concrete Slab

A Malaysian-compliant technical document outlining safe and regulated procedures for concrete slab demolition works.

find out more

Risk Assessment And Method Statement

A Malaysian-compliant safety document combining risk assessment and detailed work procedures, meeting DOSH requirements for workplace safety management.

find out more

Aluminium Formwork Method Statement

A technical document detailing aluminum formwork installation procedures and safety requirements for construction projects in Malaysia, compliant with local regulations and standards.

find out more

Download our whitepaper on the future of AI in Legal

By providing your email address you are consenting to our Privacy Notice.
Thank you for downloading our whitepaper. This should arrive in your inbox shortly. In the meantime, why not jump straight to a section that interests you here: /our-research
Oops! Something went wrong while submitting the form.

³Ò±ð²Ô¾±±ð’s Security Promise

Genie is the safest place to draft. Here’s how we prioritise your privacy and security.

Your documents are private:

We do not train on your data; ³Ò±ð²Ô¾±±ð’s AI improves independently

All data stored on Genie is private to your organisation

Your documents are protected:

Your documents are protected by ultra-secure 256-bit encryption

Our bank-grade security infrastructure undergoes regular external audits

We are ISO27001 certified, so your data is secure

Organizational security

You retain IP ownership of your documents

You have full control over your data and who gets to see it

Innovation in privacy:

Genie partnered with the Computational Privacy Department at Imperial College London

Together, we ran a £1 million research project on privacy and anonymity in legal contracts

Want to know more?

Visit our for more details and real-time security updates.